AS 1851 maintenance records in NSW, Victoria and Queensland

Fire protection maintenance in Australia is done to AS 1851-2012, and each state decides how that is enforced and recorded. NSW requires it for class 1b and class 2 to 9 buildings from 13 February 2026. Victoria asks building owners for an annual essential safety measures report. Queensland wants the technician’s licence number on maintenance records. FireSeq keeps the visit records each of these needs as the work is done.

New South Wales

From 13 February 2026, maintenance in NSW must be carried out to AS 1851-2012 for class 1b and class 2 to 9 buildings. Owners still give the council an annual fire safety statement (AFSS), and the accredited practitioner who assesses each measure relies on the contractor’s records.

In FireSeq the property’s measures register lists each item on the fire safety schedule with its standard of performance, marks the critical ones, and shows which routine covers it. The AFSS supporting pack is printed from the register and the year’s visits.

Victoria

Building owners must keep essential safety measures maintained and prepare an annual essential safety measures report (AESMR). Many buildings are maintained to AS 1851 in lieu of the original determination.

FireSeq keeps the register per property, flags measures maintained by the owner or another contractor so they are not counted as gaps, and fills the AESMR form from the register and the visit records. How the AESMR works.

Queensland

Maintenance records must show the licence number of the person who did the work. FireSeq keeps each technician’s licences with expiry dates, warns before they lapse, and stamps the licence marked “print on records” on every result.

AS 1851-2012 in short

The standard covers routine service of fire protection systems and equipment: sprinklers, pumpsets, hydrants, tanks, detection and alarm (including EWIS), special hazards, hose reels, extinguishers, fire blankets, passive fire and smoke, and the fire functions of mechanical services. Each system has its own section with monthly, six-monthly, yearly and longer routines.

Every routine has a tolerance window measured from the original schedule, so an overdue visit does not move the year. The windows, as published in FPA Australia’s matrix:

RoutineWindow
Monthly5 working days
Three-monthly10 working days
Six-monthly1 month
Yearly and two-yearly2 months
Three, five and six-yearly3 months
Ten, twenty-five and thirty-yearly6 months

This page is a summary for contractors, not legal advice. Requirements change; check the current position with your state regulator and against your licensed copy of the standard. Last reviewed 2026-11-20.

Defects fall into classes: critical defects, non-critical defects and non-conformances. Records cover logbooks, tags, labels and summary records, and the yearly visit includes a systems interface test.

How FireSeq keeps the records

  1. A routine per system on each property, with the levels you are contracted for and the anniversary date.
  2. Tasks built 60 days ahead, with a work sheet per asset and the checklist for that level.
  3. Pass, fail or no test per asset, readings with limits, photos and notes per line, and the technician’s licence on the record.
  4. Defects with a severity and a lifecycle through quote, approval, repair and close.
  5. Service, defect and logbook PDFs, a QR logbook sticker on site, and the overdue list measured against the tolerance windows.

In FireSeq

50 built-in checklists across every AS 1851 section, AS/NZS 2293.2 emergency lighting and AS 5062 mobile plant, in our own words.

Pricing · Moving to FireSeq